Construction Site Mobilization Solutions

01 Building Types

Comprehensive structural solutions for construction site mobilization.

We plan prefabricated construction site and prefabricated construction site building solutions with a holistic construction site mobilization approach covering all units, from offices to accommodation and social areas.

Construction Site Mobilizations
We assess construction site building needs according to the scale of the project and create work, accommodation, and common areas in harmony with each other.
Emergency Living Areas
In disasters and extraordinary situations, we provide safe and functional living areas that can be set up in a short time.
Mass Housing
For long-term projects, we develop modular housing solutions suitable for high capacity and focused on permanent use.
Multi Purpose Buildings
In large-scale site projects, work and healthcare structures such as a construction site office, prefabricated construction site office, infirmary, and, when needed, a prefabricated hospital can also be included in the site layout plan.
02 Campground Layout Plan

Powerful field organization with modular systems.

We design functional and coordinated campgrounds with modular structures for projects of various scales. In worker camp projects, dormitories, dining halls, management offices, healthcare, hygiene, and social areas are planned together according to personnel capacity and site requirements.

01 Facility
Dormitory
Accommodation blocks in configurations for 1–4 people; with options for rooms with bathrooms and supervisor rooms.
1 Dormitory
2 Cafeteria
3 Management Office
4 First Aid Station
5 Toilets & Showers
6 Laundry
7 Social Area
8 Mosque
9 Security Gate
03 Delivery Process

Each module is implemented as part of a comprehensive plan that facilitates on-site operations.

Reference scale: 1,000-bed worker camp

01
Engineering
2–3 weeks
3D modeling, static calculations, and official approvals.
02
Production
4–8 weeks
Factory production under ISO 9001 quality control.
03
Shipment
1–4 weeks
Transport via sea or land in flat-pack containers.
04
Assembly
3–6 weeks
On-site installation by certified assembly teams.
05
Delivery
1–2 weeks
Commissioning, completion of missing items, and occupancy permit.
04 Production Capacity
50,000 m²

We manufacture the modular structures required for large-scale camp projects without compromising quality standards. In this context, we carry out the production planning of prefabricated construction site structures according to the project scope, the number of buildings required, and the total usage area.

05 Case Studies

We successfully completed challenging projects with high capacity and planned processes.

Prefabricated Earthquake Houses
Prefabricated Houses
  • CustomerAlp Ateş Gübre
  • Total Quantity69 m²
  • Completion Time100 Days
  • Number of Buildings145 Piece
  • LocationHatay
B-MA Yapı Prefabricated Fire Brigade Building
Prefabricated Buildings
  • CustomerB-MA Construction
  • Total Area266 m²
  • Completion Period20 Days
  • Number of Buildings1 Piece
  • LocationBalat / İSTANBUL
Saltaş Elektrik Prefabricated Office Building
Prefabricated Buildings
  • Customer Saltaş Elektrik
  • Total Quantity  108 m²
  • Completion Time  6 Days
  • Number of Buildings  1 Number
  • Location  Kocaeli
06 Technical Specifications

Engineering according to international standards.

Each module is documented and certified. Fully approved packages are available upon request.

01Structure

Seismic and high load environment suitable, bolted connection hot-dip galvanized steel frame.

  • Frame Galvanized steel, S280GD
  • Floor load 2.5 kN/m²
  • Module size 3.0 × 6.0 / 12.0 m
  • Design lifespan 25+ years
02Insulation

Adjusted stone wool or PU sandwich panel shell according to desert thermal performance.

  • Wall U-value 0.34 W/m²K
  • Roof U-value 0.28 W/m²K
  • Core 75–100 mm stone wool
  • Acoustics Rw 32 dB
03Fire Safety

Non-combustible panel cores with addressable detection and optional extinguishing.

  • Panel response A2-s1, d0
  • Detection Addressable, network-connected
  • Compartment 60 min
  • Extinguishing Optional sprinkler
04Wind Resistance

Engineered anchoring and cross-bracing for open desert and coastal areas.

  • Design wind speed 180 km/h
  • Anchorage Ballast or pile
  • Exposure class C
  • Standard ASCE 7 / SBC 301
05Electrical Systems

Generator-interfaced, pre-wired distribution for independent operation from the grid.

  • Supply 380/400V, 3-phase
  • Distribution TN-S grounding
  • Protection Circuit breaker RCBO
  • Backup Generator interface
06HVAC

Sized cooling and fresh air ventilation for extreme ambient temperatures.

  • Cooling Split / VRF
  • Design environment +55 °C
  • Ventilation ASHRAE 62.1
  • Filtration G4 + F7
07 FAQ

Frequently Asked Questions from EPC teams.

How quickly can you set up a camp?
Typical 500–2,000 bed camps are operational within 8–16 weeks from contract, depending on logistics and site preparation. Larger sites are delivered in coordinated phases.
Are you managing international shipping and customs?
Yes. We deliver most Gulf, Africa, and Central Asia project sites DAP or DDP; optimized to maximize units per container for flat-pack loading.
Can the camp be portable or expandable?
All modules are disassemblable and reusable. Camps routinely grow in phases or are moved between sites with minimal material loss.
What about mechanical-electrical, furniture, and operations?
We offer fully turnkey solutions: power, water, HVAC, plumbing, furniture, and commissioning — with optional continuous facility management.
According to which standards do you manufacture?
Saudi Building Code (SBC), ASTM and ASCE references, ISO 9001 production, and project-specific EPC client specifications.
What is the minimum and maximum project size?
From remote police stations with 50 beds to multi-phase coordinated deliveries for sites exceeding 10,000 workers.
08 Evaluation Request

Tell us about your project.

Prefabricated construction site prices are determined according to the number of buildings, total area, personnel capacity, technical specifications, transportation, and installation conditions. Customized pricing is prepared for each project based on its requirements.

  • ISO 9001 certified manufacturing
  • Delivery to Gulf, Africa & Central Asia
  • Turnkey, EPC level project management
We will get back to you within two business days. There is no obligation.